Not too much to report since last post. With the extremely hot August and time away for vacation I was limited in what I could get accomplished.
5 minutes in the garage and the sweat would start.
As you can see the headlights have been mounted along with the shifter, the forward brake lines and the water hoses.
Soon I will finish the brake lines and mount the fuel tank. I then need to figure out the vacuum lines, fuel lines and a host of other items before I tackle the wiring system.
Saturday, September 5, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment